image
Oilfield Drilling Equipment

Trailer-mounted Rig

  • By
  • 2022-01-11 16:16:36
  • 3

Product Features:
1. Trailer-mounted drilling rig with separate main frame
Main series GW-M1000 and ZJ10DBT, ZJ30DBT, AJ40DBT, the rig consists of front and rear modules mainly during transportation. The front module includes drill floor and rotary table drive while the rear module includes drawworks drive, power system, suits for transportation.
 Technical features
1)  Front level of substructure may be telescoping or semi trailer mounted while the rear module is semi trailer mounted.
2)  Mast is two or three sections telescoping and can be moved with rig main module or separately.
3)  AC VFD motor drive is used for power transmission while diesel engine compound is optional.
4)  Good mobile feature with module design for easy moving and installation.
5)  A separate driller cabin is fitted. Operations for air, electric and hydraulic, drilling data and parameters are all in the cabin. All operations by driller can be completed in the cabin for better working conditions and less working strength..
6)  According to user’s requirement , auto drilling system and top drive drilling system can be equipped.
2. Trailer-mounted drilling rig with integral main frame
Model ZJ40/2250DT, ZJ50/3150DT and ZJ7DT trailer mounted drilling rigs are newly developed in recent years range 4000-7000 meters drilling depth. Such series rigs are designed for relative flat desert and Gobi area, which features simple and reliable drive system, less transportation loads and easy moving.
 
Technical features
1)  With advanced AC-SCR-DC or AC-VFD-DC electric drive technology and good drilling performance.
2)   Module-type substructure or parallelogram substructure rigged-up by drawworks power (oil cylinder) and telescoping mast or K-mast are adopted. Top drive fitting is available;
3)     The main frame can be moved integrally or separately, the mast can be moved as a whole by wheels, and the power unit can be moved by wheels integrally or separately.
4)    Highly modularized, the drilling rig can be moved with fewer trucks. The trucks used are 1/3 of what we normally use for a complete rig.
5)    Moving time is only 1/4 of what it takes for a normal rig. With less expense and high efficiency.
6)     Top drive can be equipped.

Technical parameter of trailer-mounted drilling rig with separate main frame


Drilling rig model

ZJ10DBT

ZJ30DBT

ZJ40DBT

GW-M1000

Nominal drilling
depth, m

127mm(5")drill pipe

500-800

1500-2500

2000-3200

2000-3200

114mm(4 1/2")drill pipe

500-1000

1600-3000

2500-4000

2500-4000

Max. hook load, kN

500

1700

2250

2250

Hook speed, m/s

0-0.9

0-11.5

0-1.2

0.16-1.93

Line strung of hoisting system

8

10

10

10

Drill line diameter,mm

22

29

32

32

Max. pull of fast line,kN

103

210

280

280

Drawworks

Model

JC10DB

JC30DB

JC40DB

JC32B

Power rating kW(HP)

110

600

800

735

Spee

Ⅱ,smooth change

Ⅰ, smooth change

6F+2R

Main brake         

One side hydraulic disc brake

Band brake or disc brake

Auxiliary brake

Regenerating brake

pneumatic disc brake

Crown block

TC50

TC170

TC225

TC225

Traveling block  

YC50

YC170

YC225

YC225

Sheave OD of hoisting system, mm

540

915

1120

1120

Hook         

Top drive

YG170

DG250

DG225

Swivel

Model

SL170

SL225

SL225

Stem dia., mm 

64

75

75

Rotary table

Table opening, mm(in)

520(20 1/2)

698.5(27 1/2)

698.5(27 1/2)

Speed

1F+1R,VFD motor drive

3F+1R

Drive mode

Independent motor drive

Compound drive

Mast

Type

K,two sections, telescoping

K, telescoping

Height, m  

19

33

35

40

Max. load, kN    

600

1700

2250

2250

Substructure

Type

Skid front level, semi trailer mounted rear level

Parallel front level,semi trailer mounted rear level

Swing lift trailer mounted frontlevel, trailer mounted rear level

Both front and rear
levels are semi
trailer mounted

Floor height, m

3.5

4.5

6

5.5

Clear height, m

3

3.2

4.5

4.3

Mud pump

Model ×number

F-800×1

F-1300×1

F-1300×2

F-1300×2

Drive mode

Diesel engine

Drive mode

AC-DC-AC,one for one control

Diesel engine + torque converter

Drive speed,km/h

≤30

≤10

Minimum turning radius, m  

14

16

21

22

 

 

 

 

 

 

 


Technical parameter of trailer-mounted drilling rig with integral main frame


Drilling rig model

ZJ40/2250DT

ZJ50/3150DBT

ZJ50/3150DT

ZJ70/4500DBT

Nominal
drilling
depth, m

127mm(5")drill pipe

2000-3200

2800-4500

2800-4500

4000-6000

114mm(4 1/2")drill pipe

2500-4000

3500-5000

3500-5000

4500-7000

Max. hook load, kN(t)

2250

3150

3150

4500

Max. pull of fast line,kN

280

350

350

487

Line strung of hoisting system

10

10

12

12

Drill line diameter,mm

32

35

35

38

Drawworks

Model

JC-40DT

JC-50DB

JC-50D

JC-70DB

Power rating kW(HP)

735(1000)

1100(1500)

1100(1500)

1470(2000)

Speed

2+2R DC, Smooth change

I+IR VFD, Smooth change

4+4R,
Smooth change

I+IR VFD, Smooth change

Main brake

Hydraulic disc brake

Hydraulic disc brake + Regenerating brake

Hydraulic disc brake

Hydraulic disc brake + Regenerating brake

Auxiliary brake

pneumatic drive and water-cooled disk brake

Hydraulic disc brake + Regenerating brake

Eddy disc brake

Hydraulic disc brake + Regenerating brake

Crown block

TC225

TC315

TC315

TC450

Traveling block

YC225

YC315

YC315

YC450

Hook

DG225

DG315

DG315

DG450

Swivel

Model

SL315

SL450-5

SL450-5

SL450-5

Stem dia., mm

75

75

75

75

Rotary table

Table opening, mm(in)

698.5(27.5)

952.5(37.5)

952.5(37 .5)

952.5(37.5)

Speed

1+1R Smooth change

2+2R Smooth change

1+1R Smooth change

1+1R Smooth change

Drive mode

Independent chain drive

Independent chain drive

Independent chain drive

Independent chain drive

Mast

Type      

K,two sections, telescoping

K

Height, m      

43

45

45

46.5

Substructure

Type

Integrated

swing lift or sling shot

swing lift

Get Started Instantly!

Request a Call Back Now